Diary of a Mad Man – London East 2015 – Day 3 of the build
Day 3 and the container is empty, all the obstacles are nicely stacked and ready for assembly and the Camp BF has been built. What is Camp BF? It’s the compound we build around all our stock to ensure nothing goes missing overnight. What do the B and F stand for? Can’t tell you that, it’s on a need to know basis and you don’t need to know!
We use Heras fence to build the compound and today we were not only treated to shiny panels which were nice and straight but also the firm we hired it from bought a Hiab on their truck which meant we didn’t have to unload them ourselves (nice one Karl!). Result! We love a challenge (and a free work out) but unloading 150 panels and feet takes up valuable build time and know ones likes that!
The lads also got the frame work for ’2 smoking barrels’ and ‘Castaway’ built plus they put a dent into the a-frames of underworld. A pretty good day, I’d say.
Thanks for reading.
The Beard